Installation of a 1.12 MW photovoltaic system on a roof.

Realisation of a 1.12 MW photovoltaic system installed on the roof of the factory, designed to maximise energy self-consumption and improve the building’s overall energy performance.

Bagnacavallo (RA) - Italy

Energy Solutions

Righi took care of:

  • carrying out the technical inspection at the plant to analyse the structural conditions and identify the most suitable solutions;
  • carry out the complete design of the photovoltaic system and the related electrical infrastructure;
  • install the photovoltaic system, carrying out the assembly and wiring of the panels in compliance with current regulations;
  • coordinate and manage the bureaucratic paperwork for connection to the electricity grid;
  • start up the plant following functional testing to verify its full operation;
  • implement an advanced monitoring system for real-time control of performance and energy parameters.

Challenge

The client needed to optimise the management of electricity consumption, particularly during production peaks. The main challenge was to integrate a high-power photovoltaic system on the building’s roof, ensuring structural compatibility and operational efficiency.
At the same time, the company wanted to adopt a more sustainable approach, implementing solutions for the self-production of energy from renewable sources and improving the overall energy efficiency of the plant.

Results / Benefits achieved by the customer

Significant reduction in energy consumption thanks to the use of self-produced energy through the photovoltaic system installed on the roof, with optimised management of absorption peaks and an overall improvement in energy efficiency and sustainability of the plant.