Installation of a 1.12 MW photovoltaic system on a roof.
Realisation of a 1.12 MW photovoltaic system installed on the roof of the factory, designed to maximise energy self-consumption and improve the building’s overall energy performance.

Challenge
The client needed to optimise the management of electricity consumption, particularly during production peaks. The main challenge was to integrate a high-power photovoltaic system on the building’s roof, ensuring structural compatibility and operational efficiency.
At the same time, the company wanted to adopt a more sustainable approach, implementing solutions for the self-production of energy from renewable sources and improving the overall energy efficiency of the plant.
Results / Benefits achieved by the customer
Significant reduction in energy consumption thanks to the use of self-produced energy through the photovoltaic system installed on the roof, with optimised management of absorption peaks and an overall improvement in energy efficiency and sustainability of the plant.