Installation of a 1.4 MW photovoltaic system on a roof.

Construction of a 1.4 MW photovoltaic plant on the roof of the factory, aimed at maximising energy self-consumption and increasing the building’s overall energy efficiency.

Bagnacavallo (RA) - Italy

Energy Solutions

Righi took care of:

  • carrying out the technical inspection at the plant to analyse the structural conditions;
  • develop the executive design of the photovoltaic system and the related electrical infrastructure;
  • install the photovoltaic system, carrying out the assembly and wiring of the panels in compliance with current regulations;
  • manage the bureaucratic paperwork for connection to the electricity grid;
  • perform functional testing and start-up of the system, verifying its full operation;
  • implement an advanced monitoring system for real-time control of performance and energy parameters.

Challenge

The main challenge was to integrate a high-power photovoltaic system on the building’s roof, ensuring structural compatibility and operational efficiency.
At the same time, the company aimed to adopt a more sustainable approach, implementing self-generation solutions for energy from renewable sources and improving the plant’s overall energy efficiency.

Results / Benefits achieved by the customer

Significant reduction in energy consumption thanks to the use of self-produced energy through the photovoltaic system installed on the roof, with optimised management of absorption peaks and an overall improvement in energy efficiency and sustainability of the plant. Access to tax incentives and deductions provided for by current legislation.

Case Studies in sector: Energy, Food & Beverages