Construction of a 1.7 MW photovoltaic system integrated on the roof of the factory, designed to maximise energy self-consumption and contribute to the improvement of the building’s overall energy performance.
Watch the Video
Challenge
The client needed to optimise the management of electricity consumption, particularly during production peaks. The main challenge was therefore to integrate a high-power photovoltaic system on the building’s roof, ensuring structural compatibility and operational efficiency.
At the same time, the company wanted to adopt a greener approach by using solutions that would allow the self-production of energy from renewable sources, improving its overall energy efficiency.
Results / Benefits achieved by the customer
Significant reduction in energy consumption thanks to the use of self-produced energy through the photovoltaic system installed on the roof, with optimised management of absorption peaks and an overall improvement in energy efficiency and sustainability of the plant.
Access to tax incentives and concessions provided by current legislation, resulting in shorter payback times and increased profitability of the investment.