Installation of ground-mounted photovoltaic system (Tracker)
Installation of photovoltaic system with east-west single-axis tracker system for 999.90 kWp
Watch the Video
Challenge
The customer wanted to install a high-efficiency photovoltaic system in order to maximise the annual energy production of its production plant. The challenge was to find the technological solution capable of increasing the solar yield compared to static systems. In addition, it was essential for the client to manage the entire authorisation and construction phase of the plant itself with precision and accuracy.
Results / Benefits achieved by the customer
- Maximum production efficiency thanks to the use of Tracker technology, which allows a significant increase in the energy produced compared to fixed plants;
- 999.90 kWp plant fully operational, compliant with regulations and connected to the electricity grid;
- Total and real-time control of energy performance, supporting optimised management and proactive maintenance;
- Reliable and secure electrical infrastructure, designed to last and guarantee stable performance.
- Estimated production of approximately 1.599.840 kWh/year thanks to single-axis tracking technology.